The City of Leesburg’s Construction Details and Specifications:
General Files:
General Files:
Adopted Ordinance 15-03 Sewer Use-2/9/2015 | Grease Interceptor | Oil Water and Sand Separators | Oil-Sand Interceptor | Ord 20-29 Filter Materials from Wastewater - Dental Facilities |
CAD Files
COL General Details - 2023.dwg | COL Reuse Details - 2023.dwg | COL Sewer Details - 2023.dwg | COL Stormwater Details - 2023.dwg | COL Street Detail - 2023.dwg | COL Water Details - 2023.dwg |
General Details (G- )
Reuse Details (R-)
R-01 General Notes - 2023 | R-02 ARV Reuse 2023 | R-03 Reuse Service 2023 | R-04 4 inch Blowoff Detail 2023 |
R-05 Wet Tap Detail 2023 | R-06 Valve Collar 2023 | R-07 2 inch Blowoff Valve Detail 2023 |
Sewer Details (S-)
Stormwater Details (SW-)
Street Details (ST-)
ST-01 Local Road 2023 | ST-02 Collector 2023 | ST-03 Arterial Road 2023 | ST-04 Arterial Road - Multilane 2023 |
ST-05 Road Cut 2023 | ST-06 Walkway 2023 | ST-07 Parking Cafe 2023 | ST-08 Street Signs 2023 |
Water Details (W-)
Written Standards